Projects

Blocks 3 & 7 (DPOC Collaboration)
Operating a 450 HP service rig in Paloch, providing continuous workover services in Adar Gasab and other oilfields for DPOC.

Melut Basin Pipeline Projects

Ongoing supply, coating, and delivery of line pipes for the 2019 phase of the Melut Basin Oil Development Project.

Field Surface Facilities EPCC (2016–2020)

Provided engineering, procurement, construction, and commissioning for surface facilities in Blocks 3 & 7 for Dar Petroleum Operating Company (DPOC).